{"id":3011,"date":"2026-10-19T16:23:45","date_gmt":"2026-10-19T14:23:45","guid":{"rendered":"https:\/\/hb-dryer.com\/?p=3011"},"modified":"2026-10-19T16:23:54","modified_gmt":"2026-10-19T14:23:54","slug":"belt-dryer-relocation","status":"publish","type":"post","link":"https:\/\/hb-dryer.com\/en\/news\/belt-dryer-relocation\/","title":{"rendered":"Belt dryer relocation"},"content":{"rendered":"<div class=\"wpb-content-wrapper\"><p>[vc_row padb=&#8221;50&#8243;][vc_column][vc_custom_heading text=&#8221;A second life for a belt dryer: a new location instead of retirement&#8221; font_container=&#8221;tag:h1|text_align:left&#8221; farbe=&#8221;gruen&#8221; fontsize=&#8221;fs40&#8243; schriftschnitt=&#8221;black&#8221; text_transform=&#8221;eud_text_transform_uppercase&#8221; css=&#8221;&#8221;][vc_single_image image=&#8221;3006&#8243; css=&#8221;&#8221; el_class=&#8221;pad_b50&#8243;][vc_column_text css=&#8221;&#8221;]<\/p>\n<p class=\"fs18\">When a drying system is no longer needed at its current site, its working life does not have to end. Selling the system and carefully preparing its relocation can allow it to be used elsewhere. A recent Hans Binder engineering project in Iceland shows how this process begins \u2013 and which questions operators should address before moving a drying system.  <\/p>\n<p>&nbsp;<\/p>\n<p><!-- Bild: Anlage vor der Demontage hier einf\u00fcgen --><\/p>\n<h2 class=\"fs25 bold\"><span class=\"blau\">Extending the working life of existing technology<\/span><\/h2>\n<p class=\"fs18\">Sustainability in plant engineering also means extending the service life of existing equipment. A drying system represents an investment in materials, manufacturing and technical expertise. Reusing it preserves these resources for another period of operation.  <\/p>\n<p class=\"fs18\">Technical suitability is essential: an existing system must meet the requirements at its new location. Relocation provides an opportunity to assess these requirements and plan any necessary modifications early on. <\/p>\n<p class=\"fs18\">In Iceland, one of our customers has sold its five-belt dryer to a new operator. The system will move to another site on the island, where it is intended to return to operation. Two Hans Binder engineering service technicians professionally dismantled the dryer and prepared it for transport from mid to late September 2026.  <\/p>\n<p>&nbsp;<\/p>\n<h2 class=\"fs25 bold\"><span class=\"blau\">What to consider before relocating a drying system<\/span><\/h2>\n<p class=\"fs18\">Relocating a drying system starts with planning its future use. Before the first components are dismantled, operators should compare the requirements at the new site with the capabilities of the existing equipment. <\/p>\n<h3 class=\"fs20 black uppercase\"><span class=\"gruen\">Is the system suitable for the intended process?<\/span><\/h3>\n<p class=\"fs18\">The material to be dried, the required capacity and the desired drying result are key considerations. If the system will be used for a different application, its technical suitability and any necessary modifications must be assessed. <\/p>\n<h3 class=\"fs20 black uppercase\"><span class=\"gruen\">Does the new site meet the requirements?<\/span><\/h3>\n<p class=\"fs18\">In addition to the installation footprint, important factors include ceiling height, access for assembly and maintenance, and transport routes. Energy supply, supply and exhaust air routing, and integration with upstream and downstream production processes must also be considered. <\/p>\n<h3 class=\"fs20 black uppercase\"><span class=\"gruen\">Which tasks and costs need to be taken into account?<\/span><\/h3>\n<p class=\"fs18\">Relocation involves more than dismantling and transport. Packaging, reassembly, potential modifications and subsequent commissioning must also be included. Only an assessment of the complete project can establish whether reuse is technically and economically viable.  <\/p>\n<p>[\/vc_column_text][\/vc_column][\/vc_row][vc_row][vc_column][vc_single_image image=&#8221;3007&#8243; css=&#8221;&#8221;][\/vc_column][\/vc_row][vc_row padt=&#8221;50&#8243; padb=&#8221;50&#8243;][vc_column][vc_column_text css=&#8221;&#8221;]<\/p>\n<h2 class=\"fs25 bold\"><span class=\"blau\">Reassembly begins with dismantling<\/span><\/h2>\n<p class=\"fs18\">Careful dismantling lays the groundwork for subsequent assembly. The aim is to take the components apart professionally while keeping their original arrangement and connections traceable. <\/p>\n<p class=\"fs18\">For the project in Iceland, our service technicians numbered every component and prepared the parts for reassembly. They then made the components ready for transport. <\/p>\n<p class=\"fs18\">Labelling is particularly important because the relationship between individual parts is not always immediately apparent once a system has been dismantled. Clear identification helps ensure that the components can be correctly reassembled at the new site. <\/p>\n<p class=\"fs18\">Three points are therefore essential when planning a relocation:<\/p>\n<ul class=\"fs18\">\n<li><span class=\"bold\">Documentation: <\/span>The existing arrangement and relevant connections should be documented clearly before and during dismantling.<\/li>\n<li><span class=\"bold\">Labelling: <\/span>Dismantled components must remain clearly identifiable.<\/li>\n<li><span class=\"bold\">Transport preparation: <\/span>Packaging and handling should be appropriate for the individual components.<\/li>\n<\/ul>\n<p class=\"fs18\"><!-- Bild: kurz vor Demontageende hier einf\u00fcgen --><\/p>\n<h2 class=\"fs25 bold\"><span class=\"blau\">Planning transport and assembly together<\/span><\/h2>\n<p class=\"fs18\">Dismantling, transport and reassembly are closely connected. The companies involved should therefore establish responsibilities early and clarify which requirements must be met for the next project phase. <\/p>\n<p class=\"fs18\">These include the dimensions and weights of the transport units, suitable lifting and transport equipment, and access at the new site. Any temporary storage should also be taken into account. <\/p>\n<p class=\"fs18\">Before the system returns to use, its condition, correct assembly and the necessary inspections must be addressed. Successful dismantling is therefore an important milestone on the way to its next period of operation. <\/p>\n<h2><\/h2>\n<h2 class=\"fs25 bold\"><span class=\"blau\">Iceland project: prepared for a second life<\/span><\/h2>\n<p class=\"fs18\">The photographs from Iceland show the progress of dismantling: first the fully assembled five-belt dryer, then the dismantled assemblies, and finally the largely cleared installation area.<\/p>\n<p class=\"fs18\">Two Hans Binder engineering service technicians carried out the following work on site:<\/p>\n<ul class=\"fs18\">\n<li>Professional dismantling of the five-belt dryer<\/li>\n<li>Numbering of every component<\/li>\n<li>Preparation of the components for reassembly<\/li>\n<li>Preparation and packaging for transport<\/li>\n<\/ul>\n<p class=\"fs18\">The next steps are transport and reassembly at the new site. Bringing the dryer back into operation is the goal of the following project phase. <\/p>\n<p class=\"fs18\">We thank both customers for their cooperation and look forward to seeing the system operating in Iceland again.<\/p>\n<p>&nbsp;<\/p>\n<p class=\"fs18\"><!-- Bilder: Halle fast leer \/ Halle leer hier einf\u00fcgen --><\/p>\n<h2 class=\"fs25 bold\"><span class=\"blau\">When reuse makes sense from a sustainability perspective<\/span><\/h2>\n<p class=\"fs18\">A second life can extend a system\u2019s service life and preserve existing components. Whether reuse is a suitable solution depends on the individual project. <\/p>\n<p class=\"fs18\">Alongside the condition of the equipment, operators should consider the work involved in relocation, any necessary modifications and future operation. An existing system offers a viable way forward when it suits the new application and can remain in use over the long term. <\/p>\n<p class=\"fs18\">The Iceland project demonstrates a practical approach: proven drying technology is carefully dismantled and prepared for further use.<\/p>\n<p>&nbsp;<\/p>\n<h2 class=\"fs25 bold\"><span class=\"blau\">What future does your drying system have?<\/span><\/h2>\n<p class=\"fs18\">Are you planning a relocation, sale or modernisation? Talk to us about your existing system early in the process. Together, we can clarify the steps required for your project and how Hans Binder engineering can support you.  <\/p>\n<p>[\/vc_column_text][\/vc_column][\/vc_row][vc_row padb=&#8221;50&#8243;][vc_column width=&#8221;1\/2&#8243;][vc_single_image image=&#8221;3008&#8243; css=&#8221;&#8221;][\/vc_column][vc_column width=&#8221;1\/2&#8243;][vc_single_image image=&#8221;3009&#8243; css=&#8221;&#8221;][\/vc_column][\/vc_row][vc_row full_width=&#8221;stretch_row&#8221; gap=&#8221;20&#8243; padt=&#8221;100&#8243; padb=&#8221;200&#8243; content_placement=&#8221;top&#8221; el_class=&#8221;farbverlauf_1 ecke1&#8243;][vc_column][vc_custom_heading text=&#8221;About Hans Binder&#8221; farbe=&#8221;weiss&#8221; fontsize=&#8221;fs30&#8243; schriftschnitt=&#8221;black&#8221; text_transform=&#8221;eud_text_transform_uppercase&#8221; css=&#8221;&#8221;][vc_column_text farbe=&#8221;weiss&#8221; fontsize=&#8221;fs20&#8243; fontweight=&#8221;medium&#8221; css=&#8221;&#8221; el_class=&#8221;marg_b30&#8243;]Hans Binder develops and delivers industrial drying solutions for a wide range of industries\u2014from wood and biomass to recycling, food, and industrial applications. The company&#8217;s focus is always on a holistic approach, from material analysis to perfectly matched drying technology.[\/vc_column_text][eud_button button_text=&#8221;Inquire without commitment&#8221; link=&#8221;\/kontakt\/&#8221; button_size=&#8221;eud_button_large&#8221; el_class=&#8221;arrow marg_b50&#8243;][\/vc_column][\/vc_row][vc_row full_width=&#8221;stretch_row&#8221; padt=&#8221;100&#8243; padb=&#8221;100&#8243; mobpadt=&#8221;50&#8243; mobpadb=&#8221;50&#8243; el_class=&#8221;kontaktrow&#8221;][vc_column width=&#8221;1\/2&#8243;][vc_single_image image=&#8221;1729&#8243; css=&#8221;&#8221; el_class=&#8221;marg_b10&#8243;][vc_custom_heading text=&#8221;General inquiry&#8221; font_container=&#8221;tag:h3|text_align:left&#8221; farbe=&#8221;blau&#8221; fontsize=&#8221;fs25&#8243; schriftschnitt=&#8221;bold&#8221; css=&#8221;&#8221;][vc_column_text fontsize=&#8221;fs18&#8243; css=&#8221;&#8221; el_class=&#8221;textbox_1&#8243;]Already using a Hans Binder drying system and need fast support with maintenance or spare parts? Give us a call.[\/vc_column_text][eud_button button_text=&#8221;Contact form&#8221; link=&#8221;\/kontakt\/&#8221; button_size=&#8221;eud_button_medium&#8221; el_class=&#8221;arrow&#8221;][\/vc_column][vc_column width=&#8221;1\/2&#8243;][vc_single_image image=&#8221;1730&#8243; css=&#8221;&#8221; el_class=&#8221;marg_b10&#8243;][vc_custom_heading text=&#8221;Service-Hotline&#8221; font_container=&#8221;tag:h3|text_align:left&#8221; farbe=&#8221;blau&#8221; fontsize=&#8221;fs25&#8243; schriftschnitt=&#8221;bold&#8221; css=&#8221;&#8221;][vc_column_text fontsize=&#8221;fs18&#8243; css=&#8221;&#8221; el_class=&#8221;textbox_1&#8243;]Interested in our products or want to learn more about our services? Get in touch now.[\/vc_column_text][eud_button button_text=&#8221;Call service hotline&#8221; link=&#8221;tel:+4986311854951&#8243; button_size=&#8221;eud_button_medium&#8221; el_class=&#8221;arrow&#8221;][\/vc_column][\/vc_row]<\/p>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>A Hans Binder engineering five-belt dryer is getting a second life in Iceland. Professional dismantling prepares the system for reassembly at its new location. <\/p>\n","protected":false},"author":1,"featured_media":3010,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"image","meta":{"footnotes":""},"categories":[1],"tags":[],"class_list":["post-3011","post","type-post","status-publish","format-image","has-post-thumbnail","hentry","category-nicht-kategorisiert","post_format-post-format-image"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.6 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Belt Dryer Relocation: A Second Life | Hans Binder<\/title>\n<meta name=\"description\" content=\"A second life for a belt dryer: our Iceland project shows what matters when planning dismantling, relocation and reuse of an existing drying system.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/hb-dryer.com\/en\/news\/belt-dryer-relocation\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Belt Dryer Relocation: A Second Life | Hans Binder\" \/>\n<meta property=\"og:description\" content=\"A second life for a belt dryer: our Iceland project shows what matters when planning dismantling, relocation and reuse of an existing drying system.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/hb-dryer.com\/en\/news\/belt-dryer-relocation\/\" \/>\n<meta property=\"og:site_name\" content=\"HansBinder\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-19T14:23:45+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-19T14:23:54+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/hb-dryer.com\/wp-content\/uploads\/2026\/10\/Arbeiten-in-der-industriellen-Werkhalle_vorschau.webp\" \/>\n\t<meta property=\"og:image:width\" content=\"1688\" \/>\n\t<meta property=\"og:image:height\" content=\"1220\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/webp\" \/>\n<meta name=\"author\" content=\"root\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"root\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"6 minutes\" \/>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Belt Dryer Relocation: A Second Life | Hans Binder","description":"A second life for a belt dryer: our Iceland project shows what matters when planning dismantling, relocation and reuse of an existing drying system.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/hb-dryer.com\/en\/news\/belt-dryer-relocation\/","og_locale":"en_US","og_type":"article","og_title":"Belt Dryer Relocation: A Second Life | Hans Binder","og_description":"A second life for a belt dryer: our Iceland project shows what matters when planning dismantling, relocation and reuse of an existing drying system.","og_url":"https:\/\/hb-dryer.com\/en\/news\/belt-dryer-relocation\/","og_site_name":"HansBinder","article_published_time":"2026-10-19T14:23:45+00:00","article_modified_time":"2026-10-19T14:23:54+00:00","og_image":[{"width":1688,"height":1220,"url":"https:\/\/hb-dryer.com\/wp-content\/uploads\/2026\/10\/Arbeiten-in-der-industriellen-Werkhalle_vorschau.webp","type":"image\/webp"}],"author":"root","twitter_card":"summary_large_image","twitter_misc":{"Written by":"root","Est. reading time":"6 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/hb-dryer.com\/en\/news\/belt-dryer-relocation\/#article","isPartOf":{"@id":"https:\/\/hb-dryer.com\/en\/news\/belt-dryer-relocation\/"},"author":{"name":"root","@id":"https:\/\/hb-dryer.com\/en\/#\/schema\/person\/832b67e4b94944daecc70253d813a69c"},"headline":"Belt dryer relocation","datePublished":"2026-10-19T14:23:45+00:00","dateModified":"2026-10-19T14:23:54+00:00","mainEntityOfPage":{"@id":"https:\/\/hb-dryer.com\/en\/news\/belt-dryer-relocation\/"},"wordCount":1252,"commentCount":0,"image":{"@id":"https:\/\/hb-dryer.com\/en\/news\/belt-dryer-relocation\/#primaryimage"},"thumbnailUrl":"https:\/\/hb-dryer.com\/wp-content\/uploads\/2026\/10\/Arbeiten-in-der-industriellen-Werkhalle_vorschau.webp","articleSection":["Nicht kategorisiert"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/hb-dryer.com\/en\/news\/belt-dryer-relocation\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/hb-dryer.com\/en\/news\/belt-dryer-relocation\/","url":"https:\/\/hb-dryer.com\/en\/news\/belt-dryer-relocation\/","name":"Belt Dryer Relocation: A Second Life | Hans Binder","isPartOf":{"@id":"https:\/\/hb-dryer.com\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/hb-dryer.com\/en\/news\/belt-dryer-relocation\/#primaryimage"},"image":{"@id":"https:\/\/hb-dryer.com\/en\/news\/belt-dryer-relocation\/#primaryimage"},"thumbnailUrl":"https:\/\/hb-dryer.com\/wp-content\/uploads\/2026\/10\/Arbeiten-in-der-industriellen-Werkhalle_vorschau.webp","datePublished":"2026-10-19T14:23:45+00:00","dateModified":"2026-10-19T14:23:54+00:00","author":{"@id":"https:\/\/hb-dryer.com\/en\/#\/schema\/person\/832b67e4b94944daecc70253d813a69c"},"description":"A second life for a belt dryer: our Iceland project shows what matters when planning dismantling, relocation and reuse of an existing drying system.","breadcrumb":{"@id":"https:\/\/hb-dryer.com\/en\/news\/belt-dryer-relocation\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/hb-dryer.com\/en\/news\/belt-dryer-relocation\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/hb-dryer.com\/en\/news\/belt-dryer-relocation\/#primaryimage","url":"https:\/\/hb-dryer.com\/wp-content\/uploads\/2026\/10\/Arbeiten-in-der-industriellen-Werkhalle_vorschau.webp","contentUrl":"https:\/\/hb-dryer.com\/wp-content\/uploads\/2026\/10\/Arbeiten-in-der-industriellen-Werkhalle_vorschau.webp","width":1688,"height":1220},{"@type":"BreadcrumbList","@id":"https:\/\/hb-dryer.com\/en\/news\/belt-dryer-relocation\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Startseite","item":"https:\/\/hb-dryer.com\/en\/"},{"@type":"ListItem","position":2,"name":"Belt dryer relocation"}]},{"@type":"WebSite","@id":"https:\/\/hb-dryer.com\/en\/#website","url":"https:\/\/hb-dryer.com\/en\/","name":"HansBinder","description":"","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/hb-dryer.com\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/hb-dryer.com\/en\/#\/schema\/person\/832b67e4b94944daecc70253d813a69c","name":"root","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/0912e38604a8ffd8e60d602f48be48cb4e52a0e566d14299b440abbf2689500e?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/0912e38604a8ffd8e60d602f48be48cb4e52a0e566d14299b440abbf2689500e?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/0912e38604a8ffd8e60d602f48be48cb4e52a0e566d14299b440abbf2689500e?s=96&d=mm&r=g","caption":"root"},"sameAs":["https:\/\/hb-dryer.com"],"url":"https:\/\/hb-dryer.com\/en\/news\/author\/root\/"}]}},"_links":{"self":[{"href":"https:\/\/hb-dryer.com\/en\/wp-json\/wp\/v2\/posts\/3011","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/hb-dryer.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/hb-dryer.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/hb-dryer.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/hb-dryer.com\/en\/wp-json\/wp\/v2\/comments?post=3011"}],"version-history":[{"count":3,"href":"https:\/\/hb-dryer.com\/en\/wp-json\/wp\/v2\/posts\/3011\/revisions"}],"predecessor-version":[{"id":3014,"href":"https:\/\/hb-dryer.com\/en\/wp-json\/wp\/v2\/posts\/3011\/revisions\/3014"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/hb-dryer.com\/en\/wp-json\/wp\/v2\/media\/3010"}],"wp:attachment":[{"href":"https:\/\/hb-dryer.com\/en\/wp-json\/wp\/v2\/media?parent=3011"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/hb-dryer.com\/en\/wp-json\/wp\/v2\/categories?post=3011"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/hb-dryer.com\/en\/wp-json\/wp\/v2\/tags?post=3011"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}